The Pradhan Mantri Sahaj Bijli Har Ghar Yojana, often known as the Saubhagya scheme, aims to electrify all rural areas. The Indian Prime Minister announced this initiative on 25 September 2017, and a website was launched on 16 November 2017.
Meanwhile, Shri R.K. Singh, Union Minister of Power and Renewable Energy, launched this website to track the electrification process. Through this portal, users can obtain latest updates on the status and progress of household electrification.
With a population of 65.07%, Indian villages represent the foundation of our economic system, according to the 2020 World Bank report. As a result, developing rural infrastructure through the provision of home equipment in Indian villages is critical. One initiative by Prime Minister Narendra Modi to supply power for every Indian home is the Saubhagya scheme.
One essential component of a good existence is having access to energy. Having electricity in every region of India will guarantee that all residents have access to the necessities, which is a real indication of development. Because of this access, other basic light-generating techniques are eliminated, which lowers pollution. Additionally, this access guarantees light beyond sunset, which in turn guarantees safety and a longer time frame for business activity.
Here are the features and benefits of PM Saubhagya scheme as follows:
To be eligible for PM Saubhagya scheme, you must satisfy the following requirements:
Here are some of the implementations of PM Saubhagya scheme as follows:
To apply for the PM Saubhagya scheme online, you must follow the steps given below:
Here are the objectives of PM Saubhagya scheme as follows:
The following are expected outcomes of the Saubhagya scheme:
The power connection to residences will be implemented by running a service cable from the nearest electricity pole to the house, installing an energy meter, wiring a single point with an LED bulb, and installing a mobile charging point. If an electricity pole is unavailable, other measures are provided in the program.
The project's overall cost is projected at Rs.16,320 crore, with a Gross Budgetary Support (GBS) of Rs.12,320 crore. Rural households will spend Rs. 14,025 crores, while the GBS will spend Rs. 10,587.50 crore. While GBS costs Rs. 1732.50 crore, the expenditure for urban families is Rs. 2,295 crores. It will be mostly funded by the Central Government.
PM Saubhgaya scheme was introduced on 25 September 2017, and it has already successfully completed four years of operation.
The Pradhan Mantri Sahaj Bijli Har Ghar Yojana also known as PM Saubhagya scheme, is a government of India program that aims to link all willing rural and urban families to the last mile of electricity.
The main goal of this scheme is to link all unelectrified households in India's rural and urban areas to electricity.
Yes, low-income homes get free electrical connections. The price included wiring for one light switch and plug, an energy meter, and a service cable.
The Saubhagya program's objective of electrifying every household was done, and the majority of states claimed saturation. However, established state and central power distribution programs still offer electrical connections.

Credit Card:
Credit Score:
Personal Loan:
Home Loan:
Fixed Deposit:
Copyright © 2026 BankBazaar.com.